FORTRUST

Project Details: This data center project consisted of a three-phase expansion build-out of a 32,000 square foot 36” raised floor. The new floor is backed by an N+1 power system with 2 megawatt and 2.5 megawatt generators, and 750kVA and 1000kVA UPS systems.

The scope of work also included 6,000 feet of branch power that uses over 164,000 feet of conduit through which 424,000 feet of wire was pulled. Cabling to cabinets and suites consisted of pre-engineered cable and fiber management systems in ladder racks and fiber troughs structured above the units.

Project Received 2008 AGC A.C.E. Bronze Award Project of the Year ($6-$10 Million) Subcontractor