Staples Distribution Center
Project Details: This 1.5 megawatt solar power installation, Maryland’s largest, consisted of more than 11,000 solar panels. MYR Group was the prime contractor for this project and installed 3,388 panels, concrete, support structures, a tracker system, smart combiner box with weather system and a computerized operating system by satellite link.