Project Details: The project team provided and installed new electrical services, owner furnished MCs and control panels, and wired and terminated all associated instrumentation and motor controls.
To increase production on the job, work packets were created for each floor which contained more than 1400 instruments and motors. Therefore, electrical document measurements required conversion. Original CAD drawings were based on European design standards, the documents lacked additional basic information so pre-planning and detailing became a daily design-on-the-go process. Extensive use of our prefabrication shop reduced the number of electricians required at the job site, thereby reducing congestion in an extremely limited workspace.